In Telangana, getting building permission used to be a long and difficult process. Builders and homeowners had to visit many government offices, submit paper forms, and wait for weeks or even months. But this changed when the government introduced ts bpass.
This system is an online platform. It allows people to apply for building and layout permissions directly from their computers. It makes the process faster, more transparent, and completely digital. This guide explains everything you need to know about ts bpass, how to use it, and why it’s important.
What Is ts bpass?
ts bpass stands for Telangana State Building Permission Approval and Self-Certification System. It was launched under the TS-bPASS Act, 2020. The purpose of this system is to make approvals for layouts and buildings easier and quicker.
With this platform, citizens no longer need to depend on middlemen. They can upload their documents online and track the progress themselves. This system is built to promote transparency, reduce corruption, and eliminate delays in construction-related approvals.
Who Can Apply for ts bpass?
Anyone who owns land in Telangana can apply through the ts bpass portal. This includes individual plot owners, developers, and builders. The system is open to people planning homes, apartments, layouts, or commercial buildings. You just need basic property documents. All applications must be submitted online. Paper forms are not accepted.
However, only licensed professionals can sign and submit technical drawings. These include architects, structural engineers, planners, and surveyors. They must be approved by local bodies like GHMC or municipalities. Without their certification, your application won’t move forward. So, always involve a certified expert before applying.
Key Terms in ts-bpass You Should Know
Before using the system, understand the important terms used under this Act. These definitions help you fill the application correctly.
Term | Meaning |
High-rise building | Any building above 18 meters |
Self-certification | Owner confirms all info is true |
Master plan | Official map for land use |
Application form | Digital form for layout or building approval |
Nodal Officer | District-level officer managing applications |
Single-window system | Online platform linking all departments |
These terms are used across every form and approval process.
How the ts bpass Application Process Works
The system is fast and digital. You don’t need paper forms. All steps happen online. You just need to fill the form, upload documents, and pay fees. The whole process takes a few simple steps.
Step 1: Visit the Official ts bpass Website
Go to the official website ts bpass. Make sure you use the correct link. The portal is open all day. It works on both phone and computer.
Step 2: Login or Register
If you’re a new user, register first. Enter your name, mobile, and email. Then create a password. If already registered, just log in.
Step 3: Select Application Type
Choose what you want to apply for. You can select building permission. Or you can choose layout approval. Pick the right one.
Step 4: Fill in Property Details
Now enter your property information. This includes plot size and location. Be sure to enter correct details. Mistakes may cause delays.
Step 5: Upload Required Documents
You must upload scanned copies. These include layout maps, ownership proof, and plans. Get them signed by licensed professionals.
Step 6: Pay the Application Fee
A challan is generated. Use online banking or UPI to pay. Keep the payment receipt safe. This confirms your submission.
ts bpass Layout Permissions: Step-by-Step Process
The layout approval process under this platform is simple and transparent. It happens in two clear stages. Each stage is processed through the official online portal. Let’s understand both stages in detail.
Stage 1: Tentative Layout Approval
In this stage, you apply online. You must upload the layout plan and pay the fee. The plan must follow zoning and master plan rules. If documents are correct, approval comes in 21 days. You’ll receive a Tentative Layout Plan digitally. This allows basic development work to begin.
Stage 2: Final Layout Approval
After basic work is done, you move to stage two. All roads, drains, and lights must be built. A licensed expert must certify the work. Also, public spaces must be registered with the municipality. Once submitted, the final layout plan is reviewed. If everything is correct, final approval is granted.
When Can Layout Permissions Be Revoked?
Layout permissions given under this platform are not permanent. They can be withdrawn if rules are not followed. The system allows strict action against wrong approvals.
1. False Information or Misleading Details: If you provide false data, action will be taken. Misrepresentation of land use or plot size can lead to cancellation. Submitting fake ownership documents also leads to revoked approvals.
2. Violation of Layout Rules: Layouts must follow the master plan. That includes public roads, open spaces, and utility plans. If a layout breaks these rules, permissions are withdrawn immediately.
3. Unauthorized Development: Starting construction without final approval is illegal. If development begins with only tentative approval, it violates this act. In such cases, the layout is canceled.
Building Permissions: What You Need to Know
There are clear rules depending on the plot size and type of building. Let’s look at them in a table.
Building Permission Norms Under this platform:
Plot Size | Building Type | Process |
Up to 75 sq. yds | G+1 House | No permission needed, just online registration |
Up to 500 sq. m | Up to 10m height | Allowed through self-certification |
Above 500 sq. m | High-rise or commercial | Needs NOCs, detailed plan, and full approval |
All approvals under this platform are given within 21 days. If not, they are automatically considered approved.
Role of Self-Certification and Self-Declaration
This system lets owners and builders certify details themselves. This saves time and cuts delays. But it must be done carefully and truthfully.
What Is Self-Certification?
Self-certification means the applicant confirms all building details are true. This is used mainly for small buildings. It applies to plots under 500 sq. meters. The builder or owner says, “I followed all rules.” No extra approvals are needed if the form is right. But the person is fully responsible for the truth.
What Is Self-Declaration?
Self-declaration is a public statement made by the applicant. It is a promise that all shared details are correct. It includes land details, design info, and use purpose. This step is used in most applications. False declarations lead to strict action.
When Is It Used?
It is used for low-risk buildings. Small plots. Simple structures. Projects that don’t need complex checks. The idea is to trust the builder but hold them accountable.
Self-certification and declaration make approvals faster. But misuse can lead to legal issues. Always check facts before submitting anything in this platform.
Penalties Under the ts-bpass Act
If any person or builder submits wrong information under this platform, the consequences are strict.
Penalties include:
- Cancellation of the license of the technical expert.
- Demolition of the illegal building.
- Sealing of property without notice.
- Jail term up to 3 years.
- Fine and forfeiture of mortgage property.
So, it is best to be honest and submit correct details.
Occupancy Certificate Under ts bpass
After finishing construction, apply for the Occupancy Certificate. This is a must before using the building.
Conditions:
- Applicable for low-rise buildings from 200 to 500 sq. m.
- Must submit a self-certified statement from the builder.
- Certified by licensed technical personnel.
If all conditions are met, the certificate is issued online through this platform.
Role and Action Timing of ts bpass Task Forces
Task forces under this platform are active at every stage. They check ongoing work, layout development, and post-approval buildings. If they spot issues, they can act immediately. Let’s look at when these teams step in.
1. When Illegal Construction Begins: Task forces move quickly when a building starts without permission. If no application is filed on this portal, it’s a red flag. Teams inspect the site and issue notices. They may stop work or seal the property. The builder must then follow the legal process.
2. After Self-Certification Is Submitted: Once a builder submits self-certification, inspections can happen. If the team finds wrong details, action is taken. The structure may be stopped or demolished. The technical expert may also face punishment. It rules make this process strict.
3. During Layout Development Work: If a layout gets tentative approval, task forces watch the development. They check roads, drains, and electricity work. If things are not built as planned, they stop the process. Final layout approval won’t be given until it’s fixed.
4. If Public Areas Are Not Registered: Part of the layout must be given to the local body. This includes parks, roads, and open areas. If a builder skips this step, the task force intervenes. They may cancel the approval or fine the developer.
5. On Public Complaints or Reports: Anyone can report illegal work. If someone files a complaint, task forces inspect the site. They verify the claims through field visits. If the complaint is true, strict action is taken fast. This keeps the system fair and accountable.
How to Pay Fees in ts bpass
This step comes after you submit your application. You must complete the payment to move forward. The system will guide you through each step. Make sure you follow the instructions carefully to avoid any errors.
Step 1: Submit Your Application
First, complete your building or layout application on the website. Fill in all details correctly. Upload the required documents. Make sure everything is reviewed before submission. Once done, click submit to move to the next step.
Step 2: System Generates Challan
After submission, the system will create a fee challan. This is done automatically. The challan will show the amount to be paid. It is linked to your application ID. You can download or print it for your records.
Step 3: Choose Payment Method
Now, select a payment option. This portal allows Net Banking, UPI, credit or debit card. Choose the method that works for you. The portal is secure and fast. Complete the payment without closing the browser.
Step 4: Confirmation and Receipt
Once the payment is successful, you’ll get a confirmation message. A digital receipt is also generated. You can download or print this receipt. It serves as proof of payment and is linked to your application.
Using Citizen Search on ts bpass
This site has a built-in tool. It lets users check the status of their application. No need to call or visit the office. All you need is your file or property ID.
Step 1: Open ts bpass Website
Visit the official portal. Make sure you are on the correct page. Use a browser that supports secure connections.
Step 2: Click on “Search” Button
On the homepage, look for “Search.” Click on it. You’ll see a drop-down menu appear. Choose the correct option.
Step 3: Select “Citizen Search” Option
From the list, pick “Citizen Search.” This tool is meant for applicants. It helps you track files or approvals.
Step 4: Choose Search Type
You can search by property ID or application number. Select the one you have. Enter the correct details.
Step 5: View the Application Status
After submitting, you’ll see results. Status will show pending, approved, or rejected. If approved, the certificate can be downloaded.
Customer Support for ts bpass
If you need help, the support team is available during working hours.
Service | Details |
Phone | 040-22666666 |
ts-bpass-support@telangana.gov.in | |
Address | MA&UD Office, Masab Tank, Hyderabad |
Timings | 10 AM – 6 PM (Mon–Sat) |
They guide you through the process and answer queries.
Conclusion
The ts bpass system has transformed how construction permissions work in Telangana. It replaces delays and confusion with speed and clarity. Now, residents can apply from their homes, pay online, and track approvals in real-time. Whether you’re building a home, developing a layout, or seeking a certificate, ts-bpass is the tool you need.
Using this platform saves time and ensures you stay within the law. For any construction in Telangana, ts bpass is the smart, legal, and transparent solution.